The construction of the new Hammersmith Holiday Inn has been completed.

Elliott Group has built upwards of 2,000 hotel bedrooms in recent years together with a host of leisure centers both public and private.

They have perfected hotel & leisure construction from the design stage through to handover by using practical prefabrication methods insofar as possible so that we can shorten the build time and improve the quality of the finished product. These prefabrication methods are carefully coordinated with services, ensuring life cycle and utility costs are optimised.

Swipe from Left to Right to view the construction progress from June 2019 to December 2019: